01A stadium must not go dark
A December evening match makes the benefit immediately clear: if the grid fails, safe match operations must continue. A suitably designed system can switch to island mode and supply predefined loads — floodlights, safety, communications and operations — until the final whistle. This requires grid-forming inverters, secure switching, protection and black-start concepts, and tested operating procedures.
02Energy business 365 days a year
The battery is not only for emergencies. Dynamic operation combines load management, power-market optimisation and grid services. The system works economically every day while maintaining the agreed match-day reserve.
03From pilot to football platform
The 2 MW / 5 MWh pilot at the Training Center creates reliable operating data. A 6 MW / 15 MWh stadium solution follows. Both sites are intended to be managed together and provide a model transferable to other clubs and sports venues.